2023 Status of Amendments & Approvals
The table below provides information on the status of the 2023 Federal Transportation Improvement Program in the SCAG Region.
Effective February 14, 2012, Caltrans delegated to SCAG the authority to approve Administrative Modifications to the FSTIP. The delegation letter is located on the following link: View Caltrans delegation letter.
- 10/06/22
- 10/26/22
- 01/30/23
- 02/03/23
- 03/16/23
- 03/07/23
- 03/29/23
- 06/01/23
- 05/25/23
- 05/18/23
- 05/31/23
- 06/28/23
- 06/22/23
- 07/21/23
- 08/15/23
- 08/23/23
- 09/18/23
- 10/27/23
- 10/31/23
- 11/28/23
- 12/27/23
- 12/21/23
- 01/24/24
- 02/21/24
- 03/07/24
- 04/07/24
- 04/09/24
- 04/25/24
- 05/09/24
- 05/31/24
- 07/15/24
- 07/3/24
- 07/29/24
- 08/23/24
- 7/17/24
- 09/06/24
- 10/08/24
- 11/01/24
- 11/05/24
- Read more
2023 Proposed Amendments
This page contains comparison reports of
all projects submitted in an amendment which require posting for
a 10-day public review prior to the amendments being submitted to
the approving agencies (Caltrans, FHWA and FTA). Along with the
comparison reports, the link also contains the Financial Plan and
Conformity Determination report associated with the amendment.
2023 Approved FTIP
2023 Grouped Projects Detailed Backup Listings (by County)
Grouped Projects are essentially fund
reservations that include a list of projects that are grouped by
function, work type, and/or geographic area (23 CFR Part
450.324(f)). Usually, grouped projects are for road
rehabilitation, safety, or minor improvements that do not add
capacity, require air quality conformity determination, or are
deemed transportation control measures (TCMs).